Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally.
Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Iron ore Mining
Prev
Iron ore Mining
Next

Iron ore Mining

FOB Price

Get Latest Price

|

- Minimum Order

Country:

Malaysia

Model No:

Fe 62%

FOB Price:

Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

Product Group :

-

Contact Now
Free Member

Contact Person Mr. KARU

14, Jalan KE 1/3, Kota Emerald, Rawang, Selangor

Contact Now

Product Specification

Product Description

We have here is approximately *2,**0 acres of iron ore mine land. We are not expecting one investor to take up the entire land but at least a minimum of 1,**0 acres. We have 2 nearby ports for logistic purpose. Interested investors have to do their own exploration in the land that we will provide.

1. For 1,**0 acres, estimated deposit is around *0 million metric tonnes to **0 million metric tonnes and its going to be surface mining.

2. Estimated grade is around *7 to *2.

3. Expecting a JV venture, where we will come out with the land and the investor to come out with the financial investment to operate the mine. The proposed JV share ratio will be *1% for the investor and *9% for the state government.

4. If the investor is not keen for JV, they can operate the iron ore mine by themselves **0% but some sort of profit sharing have to be agreed which is subject to negotiation.

5. The Geologist or COA ( Certificate of Analysis ) report is not available for the land as its still a virgin land with iron ore deposits. I sincerely advice you to bring your own geologist and do your own exploration to get a genuine result.

6. For 1,**0 acres, the initial exploration work where rental of machinery needed and that will cost you approximately RM**0k to RM**0K. Secondly, approximately RM*0 million to RM*5 million over a period of 3 to 6 months during mining operation depending on the size of the operation. You will get a break even after a maximum of 7 to *0 months with a minimum production of *0k metrics ton per month.

7. This is just a summary but document evidence will be presented in the meeting session if the investor is really keen to proceed. The documents are confidential in nature hence we will arrange a meeting session to table it.

Country: Malaysia
Model No: Fe 62%
FOB Price: Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: -
Packaging Detail: -
Delivery Time: -
Supplying Ability: -
Payment Type: -
Product Group : -

Related Products CHITTAL TRADERS

Send a direct inquiry to this supplier

To:

Mr. KARU < CHITTAL TRADERS >

I want to know: